El Borma Field

SMIP has been awarded the contract from SITEP B.V to make a "Long Production Test" to EL BORMA # 406 well.

  • 1
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9

EL BORMA#406 well is located in EL BORMA Concession, about 30 km of EL BORMA process facilities.

The scope of work has been:

  • Site survey
  • Project Management
  • Engineering ( Basic, FEED and Detailed Engineering )
  • Technical documentation for local Authorities
  • Hazop Analysis
  • Supply of materials, equipments and Control System
  • Construction and installation
  • Mechanical work
  • Piping work
  • Instruments and control system installation
  • Electrical installation
  • Heat treatment and N.D.T
  • Painting, insulation and lining
  • Plant pre-commissioning, commissioning and start-up
  • Operating and maintenance manual