+ 216 71 656 099

El Azel Field

SMIP has been awarded the contract from ENI Tunisia B.V to make a "Long Production Test" to EL AZEL#1 well.

  • 1
  • 10
  • 11
  • 12
  • 13
  • 14
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9

EL AZEL#1 well is located in Oued Zar concession, about 30 km South of Oued Zar process facilities.

The scope of work has been:

  • Site survey
  • Project Management
  • Engineering ( Basic, FEED and Detailed Engineering )
  • Technical documentation for local Authorities
  • Hazop Analysis
  • Supply of materials, equipments and Control System
  • Construction and installation
  • Mechanical work
  • Piping work
  • Instruments and control system installation
  • Electrical installation
  • Heat treatment and N.D.T
  • Painting, insulation and lining
  • Plant pre-commissioning, commissioning and start-up
  • Operating and maintenance manual
  • Plant operating and maintenance
expert-Piping-work-Smip