El Borma 407
SMIP has been awarded the contract from SITEP to make a "Long Production Test" on EB#407 gas well ( about 5000 psi as wellhead pressure ).
EB#407 well is located in EL BORMA Concession, about 10 km of El BORMA process facilities .
The scope of work has been :
- Site survey
- Project Management
- Hazop Analysis
- Supply of materials, equipments and Control System
- Construction and installation
- Mechanical work
- Piping work
- Instruments and control system installation
- Electrical installation
- Painting, insulation and lining
- Plant pre-commissioning, commissioning and start-up
- Operating and maintenance manual
- Plant operating and maintenance