+ 216 71 656 099

Majda

SMIP has been awarded the contract from ENI Tunisia B.V to make a "Long Production Test" on MAJDA well.
MAJDA well is located in Adam, about 35 km of Oued Zar process facilities.
  • 1
  • 2
  • 3
  • 4
  • 5

The scope of work has been :

  • Site survey
  • Project Management
  • Hazop Analysis
  • Supply of materials, equipments and Control System
  • Construction and installation
  • Mechanical work
  • Piping work
  • Instruments and control system installation
  • Electrical installation
  • Painting, insulation and lining
  • Plant pre-commissioning, commissioning and start-up
  • Operating and maintenance manual
  • Plant operating and maintenance