SMIP has been awarded from CTKCP ( Compagnie Tuniso-Koweito-Chinoise du Pétrole ) the contract to install a Sucker Rod pump on SLK#7 well in Sidi El Kilani oilfield.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9

Sidi El Kilani oilfield is located in Souassi town in the governorate of MAHDIA in the central part of Tunisia.

SLK#7 well has been producing with intermittence for months.

The scope of the work-Over was :

  • Inspect the Sucker Rod Pump on CHORBANE-1 well site.
  • Evaluate the feasibility to install this Sucker Rod pump on SLK-7 well.
  • Transport the Sucker Rod Pump from CNE#1 site to SLK#7 site
  • Install & connect the pump @SLK#7 well
  • Commissioning & start up for trial test
  • Perform trial test
  • Hand over operating pump to SLK GOSP operators.

The work-over was achieved successfully with the collaboration of CTKCP's team on site.